NPS 2011, Concrete Waste Factor 10 Percent

Life Cycle Cost Calculation View

Change by Year

Introduction
This tool generates a variety of basic life cycle cost stock statistics for DevTreks inputs.

Calculation View Description
v171a

Version: 1.7.0

Feedback About commercial/input/NPS 2011, Concrete Waste Factor 10 Percent/2147397457/none

Step 1 of 3. Make Selections


Step 2 of 3. Analyze

Relations

Use In Descendants?
Overwrite Descendants?
Compare Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Method 2. Do you wish to save the analysis as comma-separated, column-row, text? This format is amenable to further analysis in standard statistical packages. The text can be downloaded by packaging and downloading this uri.

Instructions (beta)

Step 1

  • Step 1. Base Calculations To Analyze: Choose the one option offered in this version of the analyzer.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviation is not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.
  • Step 2. Alternative: Used for comparisons.
  • Step 2. Target Type: Used for progress analysis and to set benchmarks and actuals.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying LCA calculator after inserting, deleting, or updating, this linked view (that keeps the LCA calculator's linked views synchronized with these linkedviews).


Current view of document
DevTreks -social budgeting that improves lives and livelihoods
Input Group
A1030 SLAB ON GRADE
Cost or B Type Total Amount Change Percent Change Base Change Base Percent Change
Input
NPS 2011, Concrete Waste Factor 10 Percent
Cost or B Type Total Amount Change Percent Change Base Change Base Percent Change
Date : 01/10/2013 ; Observations: 1; Alternative :
OC 0.00 0.00 0.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 1,203.50 0.00 0.00 0.00 0.00
LCC 1,203.50 0.00 0.00 0.00 0.00
Unit 1.20 0.00 0.00 0.00 0.00
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 5.000 each 1,203.50 1,203.50 1.20 mater01
U.S. National Park Service example.v139a
Cost or B Type Total Amount Change Percent Change Base Change Base Percent Change
Input Series: NPS 2007, Concrete Waste Factor 10 Percent
Date : 01/10/2007 ; Observations: 1; Alternative : A
OC 0.00 0.00 0.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 235.30 0.00 0.00 0.00 0.00
LCC 235.30 0.00 0.00 0.00 0.00
Unit 0.24 0.00 0.00 0.00 0.00
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 1.000 each 235.30 235.30 0.24 mater01
This subcost derives from ...
Input Series: NPS 2008, Concrete Waste Factor 10 Percent
Date : 01/10/2008 ; Observations: 1; Alternative : B
OC 0.00 0.00 0.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 237.30 0.00 0.00 2.00 0.85
LCC 237.30 0.00 0.00 2.00 0.85
Unit 0.24 0.00 0.00 0.00 0.85
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 1.000 each 237.30 237.30 0.24 mater01
This subcost derives from ...
Input Series: NPS 2009, Concrete Waste Factor 10 Percent
Date : 01/10/2009 ; Observations: 1; Alternative : C
OC 0.00 0.00 0.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 240.30 3.00 1.26 5.00 2.12
LCC 240.30 3.00 1.26 5.00 2.12
Unit 0.24 0.00 1.26 0.01 2.12
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 1.000 each 240.30 240.30 0.24 mater01
This subcost derives from ...
Input Series: NPS 2010, Concrete Waste Factor 10 Percent
Date : 01/10/2010 ; Observations: 1; Alternative : D
OC 0.00 0.00 0.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 242.30 2.00 0.83 7.00 2.97
LCC 242.30 2.00 0.83 7.00 2.97
Unit 0.24 0.00 0.83 0.01 2.97
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 1.000 each 242.30 242.30 0.24 mater01
This subcost derives from ...
Input Series: NPS 2011, Concrete Waste Factor 10 Percent
Date : 01/10/2011 ; Observations: 1; Alternative : E
OC 0.00 0.00 0.00 0.00 0.00
AOH 0.00 0.00 0.00 0.00 0.00
CAP 248.30 6.00 2.48 13.00 5.52
LCC 248.30 6.00 2.48 13.00 5.52
Unit 0.25 0.01 2.48 0.01 5.52
EAA 0.00 0.00 0.00 0.00 0.00
SubBOrC Name SubBOrC Amount SubBOrC Unit SubBOrC Price SubBOrC Total SubBOrC Unit Total SubBOrC Label
Material 1.000 each 248.30 248.30 0.25 mater01
U.S. National Park Service example.v139a
Dataset: NPS 2011, Concrete Waste Factor 10 Percent IRI This building construction cost estimate is computed using life cycle cycle input calculators and totals, statistics, incremental change, and progress analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.